1.Review of Maximum Span, Tension length, Conductor tension length calculation of OCS
2.Preparation of General Power Supply cum Sectioning Diagram for OCS
-
Review of OCS Drawing like- Layout Plans, Structure Erection Drawings, Sectioning Diagram, Earthing & Bonding Plan, Method Statement Preparation.
-
Coordinate with the international Supplier
-
Review of the Basic design and arrangement drawings of Retractable Rigid Conductor System.
-
Finalization of all detailed and construction designs of OCS.
-
Coordinating with client for Clarifications regarding design queries for approval of Design.
-
Calculation and preparation of Maximum Span, Tension length, Conductor tension, for OHE system.
-
Review of GADs for Insulated and Uninsulated overlap of OHE, Anti creep, ATD and associated detailed drawings.
-
Review of the Basic design and arrangement drawings of ROCS.
-
Review of Layout plans of FOCS, ROCS
-
Review of sectioning diagrams, Profile drawings, Structure erection drawings
-
Finalization of all types of Conductors for OHE.
-
Preparation of Clearance study for Overlaps, all typical arrangements of OHE.
-
Review of General arrangement drawings of Switching stations (SP/SSP/SS)
-
Finalization of Input data and reviewing of results for all Simulation studies for the project including Traction power simulation, CPDI, EMI EMC, rail potential study.
-
Finalization of all detailed and construction designs of OHE.
-
Preparation and review of Equipment layouts, Cable route, Earthing layouts, cable run, cable schedules and finalization of GIS type switching Equipment’s.
-
Coordinating with client for Clarifications regarding design queries for approval of Design.