Qureos

FIND_THE_RIGHTJOB.

MASONS / TILE & MARBLE SETTERS

Doha, Qatar

*

  • Builds structures using materials like brick, concrete, stone, and block, constructing anything from walls and sidewalks to foundations and roads.
  • Their job involves preparing and applying mortar, laying bricks and stones with precision, using specialized tools, reading technical drawings, and finishing concrete surfaces.
  • Must be physically fit to handle heavy materials, possess strong hand-eye coordination, have an eye for detail, and be able to work in various weather conditions.

Key Responsibilities

  • Construction and Assembly: Place bricks, stones, concrete blocks, and other masonry units to build structures.
  • Material Preparation: Mix and apply mortar or concrete, and spread or finish poured concrete surfaces.
  • Finishing Work: Smooth and finish concrete surfaces, such as sidewalks, floors, or curbs.
  • Tool and Material Handling: Use various hand and power tools, such as chisels, levels, plumb lines, and power trowels.
  • Technical Skills: Read and follow technical drawings and blueprints for construction projects.
  • Maintenance and Repair: Perform restorations on old and worn masonry structures.
  • Safety and Site Management: Adhere to construction safety standards, use personal protective equipment (PPE), and maintain tools and the work area
  • Installs ceramic tile, stone, and marble on floors, walls, and other surfaces by preparing surfaces, cutting and shaping materials, applying adhesives, and finishing the installation with grout and sealers.
  • Their work requires attention to detail, strong physical stamina for bending and kneeling, and the ability to read blueprints to ensure precise and aesthetically pleasing installations.

Key Responsibilities

  • Surface Preparation:Examine blueprints and surfaces to determine material needs, measure and mark surfaces, and prepare them by applying a cement mortar coat to a metal screen or attaching waterproof paper.
  • Cutting and Shaping:Use wet saws, hand and power cutting tools, and tile scribes to cut and shape tiles to fit accurately around obstacles, into corners, and to create decorative patterns.
  • Adhesive Application:Mix and apply mortar, cement, mastic, or other adhesives using a trowel to create a stable bed for the tiles.
  • Tile Setting:Lay the cut tiles onto the prepared surface, pressing or tapping them into the adhesive to ensure they are firmly affixed and level.
  • Grouting:Apply grout between the tiles using a rubber trowel (float) to fill the joints.
  • Finishing:Wipe the tiles after the grout has set to remove residue and polish the surface for a clean, finished look.
  • Sealing:Apply a sealer to the grout joints to make them stain- and water-resistant.

Job Types: Full-time, Permanent

Pay: QAR1,000.00 - QAR1,500.00 per month

Application Question(s):

  • Will be able to transfer sponsorship right away?
  • How soon can you join if you will be hired?
  • Will you be able to come for a personal interview any time?

Experience:

  • Masonary: 5 years (Preferred)

Language:

  • English? (Preferred)

Location:

  • Doha (Required)

© 2025 Qureos. All rights reserved.