Qureos

FIND_THE_RIGHTJOB.

PPC Engineer

India

  • MRP Run as per dispatch schedule for order recommendation for WO and PO
  • PO generate threw Oder recommendation and mail manually to all vendors
  • Shortages declare as per Planning M/C list. and give planning to vendors / M1
  • Generate Production order of M/C for material issue.
  • Make Service order of Job work material. (Process For Ex. Coating, platting, Anodising & Machining)
  • Arrange Vehicle (Tempo) for ready Material at local Vendor to take it our unit.
  • Monthly Planning for other Vendor & Follow up dates.
  • Go for Vendor visit to a critical Vendor for material planning as per priority basis.
  • Clearance of Spare and Undeclared shortage ITR.
  • Return ITR Close from CTS
  • Drawing revise for any changes in items received from vendors
  • Circulate revise drawing to vendors and Production dept.
  • Bill of Material related Problem solve with approval of BOM dept. & Design Dept.
  • Bay status checks on daily basis physically and SAP also.
  • For shortages Material arranges transport. Take rate of from all transporters and then final transport for shortages material supply.
  • Alternate Vendor Development for Problematic material (items).
  • Follow up with production dept. for daily production
  • Bay report circulation on M/C dispatch time to CTS or management.
  • Consumable items purchasing in regular interval.
  • Rectification of Stock (Ex. stores, Bay & Production dept.)
  • Machine diversion due to priority change in customer and extra material summited to MST or other machine
  • Bay allocate to Machine
  • Training to new comers for System and physically material identification
  • Trouble shooting error solve for all dept.
  • Maintain documents of Job work like MS sheet, SS sheet
  • Daily Material checking in inward as per purchasing list.
  • Urgent Material pushes up from Inward to Most. (For Production)
  • Raise R & D purchase order Manual purchase order
  • After Material rejection Deviation check and co-ordinate with QC dept. & Design Dept. ( Deviation Clearance)
  • Give them Production planning of m/c as per dispatch schedule.
  • follow up for new vendor registration , item master , business partner
  • Manual PO issue, follow-up and receipt of material
  • Resolve and reply on CTS complaints
  • Productivity improvement
  • Transfer Rejected material during production to production rejection warehouse
  • Preparation of Packing Slip and inform to CTS
  • Local Visit due to CTS complaints to resolve the problem
  • Send PO by mail manually
  • Payment planning of Supplier
  • Resolving supplier issues
  • PO Closing in SAP for more than 60 days above
  • ITR Closing Against IT or Open Work order & Close
  • Production order Closing on time
  • Make PDI Report
  • Update PDI whenever required as per CTS Complaint
  • Follow up supplier for Invoice
  • Check material availability of Dadra and arrange transport , Make PO , arrange Bill inward and take it in stock
  • Internal meeting with CTS department regarding Shortage and ITR Clearance
  • conduct meeting with Production regarding production planning
  • if BOM revised then close old PO , work order ,ITR as per New BOM and Raise new Work order , ITR, and PO
  • Capture Photo of Machine Dispatch and Circulate to CTS
  • Improvement in Jigs and Fixture
  • House keeping
  • Maintain the MSL of Raw material
  • Release Daily production planning
  • take Rate of Raw material like MS, MS sheet and SS Sheet
  • Prepare Annexure for Labour job
  • Get Drawing from design department if not available in Team Centre
  • Follow-up for Change in BOM During production
  • Follow up for correction in BOM after Machine approved without Vendor section, wrong item code, rate, etc.
  • Inward material LR COPY collection from Supplier

ü Collect the material from transport and follow up

ü Debit Note

Job Type: Full-time

Pay: ₹20,000.00 - ₹30,000.00 per month

Education:

  • Diploma (Preferred)

Experience:

  • total work: 2 years (Preferred)

© 2025 Qureos. All rights reserved.