Master Production Scheduling (MPS):
Develop and maintain a comprehensive master schedule for all divisions, balancing high-volume output (Ready Mix) with precision-engineered fabrication (Steel/Aluminum).
Resource & Capacity Planning:
Optimize the allocation of manpower, machinery, and raw materials across diverse production lines to maximize efficiency and minimize downtime.
Inventory & Material Management:
Lead the Material Requirements Planning (MRP) process to ensure timely availability of specialized materials (e.g., specific marble grades, aluminum extrusions, and steel sections) while maintaining lean inventory levels.
Cross-Functional Coordination:
Act as the primary link between Sales, Procurement, Logistics, and Site Operations to align production with real-time project demands.
Process Optimization:
Implement Lean Manufacturing and Six Sigma principles to reduce waste in modular assembly and marble cutting.
KPI Reporting:
Monitor and report on key metrics including Schedule Attainment, On-Time Delivery (OTD), and Production Variance to senior leadership.