Rehabilitation work for 300KV GIS at Al-Zour South power station.
Include removal of old 300KV switchgear , removal old local control panel, change busbar & GIB insulator, install new 300KV GIS, re-used of some LV control cable, new LV cable laying and termination, test, and commissioning.
Experience
Protection and control system Engineer at least 710-year experience in Kuwait, Familiar with MEW primary substation 400/300/132/33/11/.415 KV preferred experience in one & half scheme and double busbar as well 400/300/132KV substation
Understand schematic diagram for different manufacturer
Trouble shooting faults
Panel modification work
Prepare project cable list, termination schedule details, red mark drawing and a- built drawing
Carry out coordinate test and commission activities for protection (i.e., busbar protection, 3 Circuit Breaker protection, bay protection, OHL main-1 & Main -2 protection, generator protection and couple TR protection etc.).
Prepare and modify site test report for protection & control Panel and follow up with client for approval.
Responsible to arrange and open the necessary PTW (permit to work).
Manage subcontractor teams on daily basis.
Coordinate with MEW Site engineer and site representative on daily basis .
Coordinate with MEW safety and security department for Firefighting isolation and normalization on daily basis.
Estimate and order the local purchase material if required for PJ.
Coordinate and support PJ Erection & testing SV’s.
Report for PM for daily, weekly and month reports.