Qureos

FIND_THE_RIGHTJOB.

Senior QA/QC Engineer Architect/Fitout

Riyadh, Saudi Arabia

Job Responsibilities:

  • Manage and oversees the quality and workmanship of every activity, thorough knowledge of all phases of
  • engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary
  • operations.
  • Manage the QA/QC documents of the entire project including certificates, calibration, test results, inspection
  • requests, non-compliance reports and site instruction/observations, permanent materials delivered and other
  • QA/QC documents.
  • Develop and determine all standards to perform inspection and tests on all procedures and oversee all testing
  • methods and maintain high standards of quality for all processes.
  • Follow the QA/QC Plans, Approved Method of Statements, Approved Test Plans and Approved Drawings
  • during the project in order to meet the project quality requirements and client’s expectations.
  • Ensure that all available Method Statements, ITPS and Drawings are approved and the last revision.
  • Ensure that all approved Method statements, ITPs and Drawings are followed on sites.
  • Ensure that all superseded documents are removed from the site.
  • Prepare work inspection requests (WIR) for each construction activity and submits to consultant to ensure it
  • covers all the construction activities done on site.

Required Skills and Experience:

  • must have Bachelor of Architect Engineering
  • must have 7+ years working experience for QA/QC Architect or Fitout with mega construction projects preferable hotels and similar building projects
  • candidate must have good experience in QA/QC Department with Architect Fitout scope
  • Ensure that all site items are inspected properly thoroughly before calling the consultant for inspection.
  • Ensure that work inspections are carried out as per the plans and advises the construction team for the
  • corrections/corrective actions to avoid the rejection of work.
  • Ensure that all drawings used in the inspection are approved and last revision.
  • Ensures that 90% of work inspections shall be passing during the first submission.
  • Conduct the quality tool box and method statements briefing for all the activities.
  • Ensure that method statements briefing is carried out for each and every activity and records are maintained in
  • the monthly Quality report.
  • Ensure all incoming materials are checked as per the project specifications and approved material submittals.
  • Ensure that all materials are inspected internally before offering inspection to the consultant, and before using
  • in site.
  • Raising an NCR to the supplier in case of rejecting any material delivered to site and keep the record of
  • inspection in the monthly Quality report.

© 2025 Qureos. All rights reserved.