Qureos

FIND_THE_RIGHTJOB.

Automation Maintenance Specialist

Zonguldak, Turkey

GENERAL QUALIFICATIONS AND JOB DESCRIPTION

As one of the leading companies in the energy sector, we are looking for a colleague in the Measurement Control/Automation Maintenance field to be evaluated within the scope of Automation Maintenance activities with the qualifications specified below for our company.


  • Graduated from Electrical Engineering, Electrical-Electronics Engineering or Control and Automation Engineering departments of universities,
  • Having worked in Thermal Power Plant installation or maintenance and repair activities for at least 3 years,
  • Dominates Measurement Control/Automation maintenance processes of Boiler, Turbine FGD-ESP processes.
  • Has a high sense of responsibility, disciplined, proactive and results-oriented approach,
  • Has reporting and presentation skills,
  • Has team management experience,
  • Can keep up with the intense work tempo, is compatible with flexible working hours,
  • Speaks good level of English,
  • Can use MS Office programs effectively,
  • Can reside in Zonguldak.


JOB DESCRIPTION


  • To detect malfunctions in Boiler, Turbine FGD-ESP and Auxiliary facilities processes in order to ensure continuity of production activities in units, to ensure their repair and maintenance,
  • To have knowledge of automation projects, good knowledge of PLC, Scada and DCS,
  • To perform/have performed periodic and planned maintenance of all mechanical equipment in the area of ??responsibility,
  • To keep machines and equipment in the processes in a working condition at all times,
  • To monitor spare materials and equipment and to ensure that maintenance records are kept,
  • To report maintenance and repair activities,



Eren Energy Electricity Production Inc. is a coal-based thermal power plant with a total installed capacity of 2790 MW/Hour in Çatalağzı town of Zonguldak. It consists of three facilities: ZETES-1 with a capacity of 160 MW/Hour, ZETES-2 with a capacity of 2x615 MW/Hour and ZETES-3 with a capacity of 2x700 MW/Hour. In addition, Eren Enerji has a port with a capacity of 15 million tons to meet the coal needs of the power plant

© 2025 Qureos. All rights reserved.