Qureos

Find The RightJob.

Electrical Engineer (PCC & Start-up)

Job Description

FIELD & LEER BUILDING:

  • LEER/FIELD PERMIT SYSTEM AND ALL THE NECESSARY ARRANGEMENTS/VERIFICATION FOR ALL ACTIVIES
  • LOTO SHALL BE PROVIDED AND IMPLEMENTED AS PER BU
  • LEER SUBSTATION /MCC PANELPANEL VERIFICATION AND STARTUP
  • ALL ITR CHECKS VERIFICATION
  • INTERLOCK CHECKS
  • EDG FUNCTION TEST
  • ALL MOTOR SOLO RUN TO BE PERFORMED
  • ALL PUMPS AND COMPRESSORS MRT NEED TO BE COMPLETED
  • BATTERY ROOM VERIFICATION
  • INSPECT SWITCHGEAR FOR PHYSICAL DAMAGE BEFORE PERFORMING TEST.
  • VERIFY THE NAME PLATE DETAILS OF THE SWITCHGEAR AGAINST THE APPROVED DRAWINGS.
  • CHECK SWITCHGEAR EARTHING IS DONE PROPERLY AS PER APPROVED DRAWING.
  • CARRY OUT WIRING AND TERMINAL CHECKS ON CONTROL AND AUXILIARY CIRCUITS, AS PER APPROVED SCHEMATIC DRAWINGS.
  • BOM VERIFICATION AGAINST SCHEMATIC DRAWING
  • CHECK THE FUNCTIONING OF CIRCUIT BREAKER AND RECORD THE RESULT.
  • PRIMARY INJECTION TEST
  • PROTECTIVE RELAY TEST (SECONDARY INJECTION TEST)
  • STARTER / MCCB / ISOLATOR CHECKING FOR LVSG SYSTEM
  • ENERGIZATION AND FUNCTION /INTERLOCK VERIFICATION FOR ALL EQUIPMENTS
  • VISUALLY INSPECT FOR EXTERNAL AND INTERNAL MECHANICAL DAMAGE FOR LIGHTING SYSTEM.

21VERIFY THAT THE NAME PLATE DETAILS/ IFC/DATA SHEET ARE CORRECT AS PER APPROVED DOCUMENT FOR ALL SYSTEM.

  • CHECK THAT THE EARTHING CONNECTIONS ARE PROPER AND CHECK EARTHING CONTINUITY.
  • ENERGIZE THE LIGHTING MCCBS.
  • SIMULATE AND CHECK THE OPERATION OF TIMERS/PHOTOCELL SWITCHES
  • POWER UP ALL WELDING SOCKETS ,LIGHTING PANELS AND ALL EQUIPMENTS
  • FUNCTION CHECK FOR ALL EQUIPMENT AND LIGHTING ALL SKIDS AND VENDOR ITEMS
  • VERIFATION AGAINST DRAWING IFC/DATA SHEET FOR ALL SKIDS AND VENDOR ITEMS
  • UPS POWERUP
  • VERIFICATION OF VOLTAGE,UPS
  • DISCHARGE TEST
  • INSPECT THE MOTORS AND LCS FOR ALL SKIDS AND VENDOR ITEMS
  • WINDING RESISTENCE TESTING FOR ALL SKIDS AND VENDOR ITEMS MOTORS
  • IR TESTING FOR ALL SKIDS AND VENDOR ITEMS
  • HVAC commissioning and startup

Minimum Qualification: Diploma /Bachelor’s Degree in Electrical Engineering

Experience: Diploma-10–15 years in oil & gas projects;

Bachelor’s Degree -8-15 years in oil & gas projects

Overseas experience : Yes(Bahrain is preferred)

Documentation Responsibility: Test packs, energization permits, red-lines, handover dossiers

Soft Skills / Leadership: Leadership, coordination, strong HSE awareness,technically strong

Standards knowledge (added advantage ): IEC, IEEE, API; Compressor station experience

Minimum Key Technical Competencies: MV/LV switchgear, MCCs, motors, VFDs, protection relays, energization

© 2026 Qureos. All rights reserved.