Qureos

FIND_THE_RIGHTJOB.

Engineer - Quantity Surveyor and Planning

JOB_REQUIREMENTS

Hires in

Not specified

Employment Type

Not specified

Company Location

Not specified

Salary

Not specified

Interested candidates are requested to contact Mr. Gowshik - (WhatsApp) +91 7305029033 / Calls - +91 8071737413

Email Id: gdtsta05@gdtsolution.com

Job description:

Quantity Surveyor (Global Office)

Location: Coimbatore
Reports to: Project Director (Guyana)
Works with: Project Engineer, Site Supervisor, PMC/Consultants, Procurement, Finance, Vendors
Purpose: Owns cost control and progress verification from HQ—pulls data daily from site, validates, updates Zoho/Power BI dashboards, manages BOQ, certifies bills, tracks variations/claims, and forecasts cashflow & final cost.

Experience & Qualifications:

5–8 years in QS/Cost Control on interior fit-out/residential projects; multi trade exposure (doors, Aluminium, modular furniture, gypsum).

Degree/Diploma in Quantity Surveying/Civil (RICS/AIQS/CIOB valued).

Demonstrated dashboard/reporting ownership and bill certification experience.

Key Responsibilities

A) Cost, BOQ & Measurement

 Maintain Master BOQ; create work packages (doors, windows, wardrobes, false ceiling).
 Take-oA & verify measured progress: doors fixed, windows installed, wardrobes assembled, ceiling area (sq.ft) completed—tie to drawings & RFIs.
 Maintain Rate Analysis and Cost Codes; update Unit Rates and Cost of Work Performed (CWP) monthly.

B) Subcontractor Billing & Variations

 Prepare/verify Interim Payment Certificates (IPC); certify Subcontractor Bills (with measurement sheets & photos).
 Run Variation/Change Order log: scope, cause, qty, rate, EOT link, commercial impact.
 Negotiate rates/unsupported claims; recommend approvals with evidence.

C) Cost Control & Forecasting

 Produce weekly Cost vs Budget (CV), Schedule vs Progress (SPI/CPI) and EAC/ETC forecasts.
 Track material reconciliation (doorsets, hardware, gypsum boards, aluminium frames, silicone/PU foam, accessories).
 Maintain cashflow (committed, spent, forecast) and liability aging.

D) Data Pipeline & Reporting (Zoho/Power BI)

 Pull Daily Progress Reports (by 6:00 GYT cut-oA), validate, and update Zoho Creator/Analytics and Power BI.
 Publish: Daily snapshot (next morning by 9:30 GYT), Weekly dashboard (Mon), Month-end MCR (within 3 biz days).
 Keep RFI/WIR/NCR logs aligned with cost impact and close-out.

E) Governance & Coordination

 Enforce document control (naming, versions), audit trails, and two-person check on bills.
 Drive look-ahead cost reviews with PD/PE; flag risks early (lead time, shortages, design clashes).

Must-Have Skills:

 QS Core: BOQ, take-oAs, re-measurement, rate analysis, contract conditions (FIDIC-like), change control.

 Drawings: Architectural, joinery, RCPs; read door/window schedules; ceiling layouts.

 Data & Tools: Advanced Excel (INDEX/XMATCH, SUMIFS, Power Query), Power BI, Zoho Creator/Analytics, Google Drive; basic PowerPoint for exec packs.

 Controls: Earned Value (PV/EV/AC), CPI/SPI, WBS & cost code structures, three-way match (PO–GRN–Invoice).

 Communication: Clear site interactions over WhatsApp/Email, concise executive summaries, negotiation with vendors.

Deliverables (What they produce)

 Daily: Site progress digest (units by trade), exceptions list, photo links, labour snapshot.

 Weekly: S-curves, CPI/SPI, cost variance, look-ahead risks, procurement tracker, NCR closure.

 Monthly: MCR pack—Budget vs Actual, EAC, cashflow, claims status, material recon, variation register, commercial risk heatmap.

 Rolling Logs: RFI/WIR/NCR, Subcontractor Bills, Change Orders, Procurement & Delivery.

Data Pipeline SOP (cut-offss & checks)

Cut-offs (America/Guyana time):

 Site DPR inputs (quantities, photos): by 18:00 daily.
 QS validation & ingestion: 18:00–22:00.
 Publish Daily Snapshot: by 09:30 next day.

Validation steps:

1. Quantity sanity checks (max/day thresholds; e.g., doors/crew/day ≤ 2; ceilings ≤ 80 sq.ft/crew/day).
2. Cross-checks: Quantity vs. labour deployed; photos/WIR entries present.
3. Movement test: No negative cumulative; flag step-jumps > 25% vs trend.
4. Exception sheet auto-emailed to Site Supervisor & PE.

Job Type: Full-time

Pay: ₹55,000.00 - ₹65,000.00 per month

Work Location: In person

© 2025 Qureos. All rights reserved.