Qualification:
Mechanical / Metallurgy Engineering
Experience:
15 to 18 years
Project:
Guddu Barrage Location Kashmore Sindh
-
Project Quality Plan (PQP):
A comprehensive PQP outlines the quality policies, procedures, and practices specific to a project. It serves as a roadmap for the project team to ensure that all quality requirements are met.
-
Inspection and Test Plans (ITP/QIPs):
These documents detail the specific inspections and tests to be conducted during various stages of construction. They ensure that all materials and workmanship comply with the project's quality standards.
-
Welding related data preparation and Management, WPS , PQR, NDT, Lab Testing WPS/PQR, WQT , Inspections, Planning and execution methodology
-
Knowledge of ASME, API and Other International Codes and Standards e.g. ASME SEC(II, V, VIII DIV I, IX, B31.1, B31.3, AWS)
-
Experience of Barrage Gates Fabrication and Testing Requirements
-
QA&QC Process Knowledge
-
Cost of Poor Quality Initiative
-
Ensuring that all vendor-supplied materials and equipment meet project specifications is crucial. This involves reviewing vendor documents and certifications to verify compliance with quality standards.
-
Factory Acceptance Tests (FAT):
Coordinating and supporting the execution of FATs at vendor premises ensures that equipment and materials meet the required standards before being dispatched to the site.
-
Material Receiving Procedures (MRP):
Developing and overseeing MRPs ensures that all materials received on-site are inspected and meet the project's quality requirements.
-
Field Quality Alerts (FQA):
Implementing FQAs helps in promptly addressing any quality issues identified on-site, preventing potential defects.
-
Corrective Action Requests (CAR):
Encouraging a proactive approach by initiating CARs can help in identifying and mitigating quality.