Project Estimator – Rigging (Data Centers, Pharma, Semiconductor)
Role Summary
Own the rigging portion of complex industrial/commercial bids. You’ll mine 1,000+ page RFPs/specs/drawings for what actually matters, define the rigging scope, quantify labor/equipment/duration, and deliver complete, defensible bid packages that operations can build and finance can trust.
Core Responsibilities
-
Scope Extraction & Clarification
-
Parse RFPs/specs/drawings (Div 01/05/11/13/14/40–46, appendices, vendor cut sheets) to isolate rigging scope: receiving, uncrating, hoisting, setting, anchoring, alignment, cleanroom/contamination controls, turnover.
-
Build and track RFIs; resolve conflicting notes between architectural, structural, MEP, process, and tool/vendor sets.
-
Quantity Takeoff & Means/Methods
-
Perform detailed takeoffs: weights/CGs, travel paths, floor loading, pick radii, lift heights, access constraints, rigging gear lists, temporary works.
-
Select feasible means/methods: cranes vs. gantry vs. Versa-Lift/forklift vs. skates/hydraulic jacks; develop alternate approaches when logistics or vibration limits demand it.
-
Pricing & Production
-
Calculate crew compositions and man-hours by activity (receive, stage, rig, set, align, anchor, clean, turnover).
-
Price owned equipment vs. rental (cranes, gantries, forklifts/Versa-Lifts, dollies/skates, hydraulic power packs, spreader bars, specialty rigging).
-
Apply correct wage rates, fringes, OT rules, per diem, travel, mobilization/demob, consumables, small tools, waste, and escalation.
-
Schedule & Logistics
-
Build level-2/3 rigging schedules with durations, constraints, and float; coordinate around tool install, shutdowns, and blackout dates.
-
Plan site logistics: laydown, ingress/egress, rigging routes, floor protection, housekeeping, crane setups, lift sequencing, after-hours work.
-
Risk & Compliance
-
Identify risk items (weight/sling capacity margins, floor loads, vibration limits, contamination control, lift plan approvals, shutdown windows) with mitigation and cost.
-
Include safety planning assumptions (JHAs, lift plans, permits), cleanroom protocols (gowning, wipe-downs, bag-in/bag-out), and GMP/validation touchpoints where applicable.
-
Sub/vendor Management
-
Solicit, level, and lock quotes for crane service, specialty transport, engineered picks/temporary works, anchors/epoxy, rigging gear rental, and disposal.
-
Bid Package Assembly
-
Produce complete bid deliverables (see checklist below) and present at internal reviews; hand off to Operations with clear assumptions and alternates.
-
Post-Bid Support
-
Respond to clarifications, VE options, and negotiate scope. Upon award, support turnover and early buyout.
Required Qualifications
-
5+ years in industrial/commercial rigging estimating or heavy-mech/tool install (data center/pharma/semiconductor preferred).
-
Strong blueprint/spec literacy (general, structural, MEP, process/tool drawings; lift plans; vendor prints; P&IDs/GA helpful).
-
Proven ability to model picks, floor loads, and lift paths; practical understanding of cranes, gantries, Versa-Lifts, jacking/skating systems.
-
Advanced Excel (production rates, parametrics, sensitivity), Bluebeam Revu (takeoff), scheduling (MS Project or P6).
-
Experience leveling vendor/sub quotes and writing scope clarifications/exceptions.
-
Safety-first mindset; working knowledge of OSHA/ASME B30 rigging standards; cleanroom/GMP basics for pharma/semi.
-
Clear written and verbal communication; able to defend a number.
Nice-to-Have Certifications
-
NCCCO Signalperson/Rigger (or equivalent), OSHA-30, TWIC (as needed), 3D lift planning (AutoCAD/Revit/3D Lift Plan), anchor/epoxy installer cards.
Key Performance Indicators (measured quarterly)
-
Estimate Accuracy: ±10–15% variance estimate-to-actual labor/equipment on closed projects.
-
Hit Rate & Throughput: Qualified bids submitted vs. awards; on-time submission rate.
-
RFI Efficiency: Avg. days to resolve critical scope RFIs; % of bids with unresolved criticals at submission (target: 0%).
-
Schedule Reality: % of operations feedback indicating durations were buildable without re-baselining.
-
Risk Capture: # of material risk items identified vs. realized.
Tools You’ll Use
-
Bluebeam Revu, Excel (power user), MS Project or P6, 3D Lift Plan/AutoCAD (or equivalent), SharePoint/Teams or Procore, and our ERP/estimating templates.
Working Conditions
-
Office-based with site walks and pre-bid meetings (travel as required by pursuit).
-
Occasional off-hours work for shutdown reconnaissance.
Bid Package Deliverables (Checklist)
-
Executive summary & written scope narrative (what’s in/out; assumptions; alternates).
-
Detailed takeoff with weight/CG data, counts, and rigging gear lists.
-
Man-hour build by activity/crew; crew mix and shifts.
-
Equipment plan (owned vs. rental), crane/gantry sizing calcs, floor load checks.
-
Levelled sub/vendor quote tab with inclusions/exclusions.
-
Level-2/3 schedule with durations, logic ties, and constraints.
-
Risk register with mitigations and cost impacts.
-
Safety/quality provisions: lift plan requirements, JHAs, cleanroom/GMP controls, QC/turnover documentation.
-
Commercials: clarifications/exceptions, escalation, taxes, bonds, insurance notes.
-
Turnover pack outline for Operations.
Salary & Benefits (fill to fit your market)
-
Exempt; base $XX–$YY DOE + bonus tied to hit rate and estimate accuracy.
-
Medical, dental, vision, 401(k) with match, PTO, paid training/certifications.
Reporting Line
Reports to: Preconstruction Manager or Director of Estimating. Works daily with Operations, Project Management, Safety, and Logistics